G1sammons
Bronze Member
- Thread starter
- #21
Oakview2 said:G1
How are the improvements coming along...
Be done in a few more days !!!!
Iv cut the hose down and moved the center pontoon forward! And also welded 6" long posts to keep the hose on the dredge along the sides when moving it up and down the river..it's alot easer on the divers than rolling it up ...
I also had to make some wheels to run it up and Down the ramp...as I'm using a enclosed trailer and can't back it into the water I just pull it up the ramp with a truck buts its a rough ramp so I think I'll use 6 dolly wheels to load and unload .. Might get a little more life out of the floats...
I also have to redo the carpet as the glue didnt hold,up on the run last week ...
The dredge did pretty good but I'm still working some bugs out ... It's alot different than running a 4" I'm actually tired when I get done ..
But my god can that thing move some materal ... It's gona be hard to,go back to a 4" machine ....
I also, put a hose reel on for the air hoses and making a jet to drive it around ... I'm just gona put a t in at the pump to shut the box off and turn the jet on to drive it back to camp at the end of the day ...
I'd,like too make some gates for the side boxes but ill probally run it at least one more time befor making any changes
My idea is to,slow,the water down. A little more and go to some expanded metal instead of the riffles ...
See,if I can finds some pictures