EquipDesign
Greenie
Was wondering if anyone was working on equipment that may need suggestions from others in order to finish it??
Here is my Long Tom, and South Yuba Mining hopper I put together.
The Gold Hog, Scrubber mat is first in line just past the drop zone of the hopper, then the Razorback Sluice mat, and then the UR mat. The second part or second sluice has a Vortex mat under dredge riffles that finishes the Keene 10 inch boxes.
I'm using turn buckles from the front of a lawn mower for the leg system, allowing the box to move a little when it needs to...
Here is my Long Tom, and South Yuba Mining hopper I put together.
The Gold Hog, Scrubber mat is first in line just past the drop zone of the hopper, then the Razorback Sluice mat, and then the UR mat. The second part or second sluice has a Vortex mat under dredge riffles that finishes the Keene 10 inch boxes.
I'm using turn buckles from the front of a lawn mower for the leg system, allowing the box to move a little when it needs to...