Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Yes I would build it myself but don't have a lathe
I dont know in your town but here theres places with all type of machinary you just pay the price.
Keep us updated and let us now how it goes.
omnicron- before spending a ton on a completely new setup, I would give your jet the most attention first because it will drive the sizing of all the other components in the system. An efficient jet will reduce the pump volume requirements dramatically and possibly enough to use your existing pump and dredge to run a 5" hose instead of a 6". The increase in hose area from 4-5" is only a 56% increase and since the dredge is designed for a total volume of throughput this may save big bucks while still providing more material movement.
ie.. 4" dredge using log jet - jet has approx. 1-1 ratio of suction to supply (250gpm draw = 500gpm total volume to box)
A 5" efficient jet could render ratio's in the range of 3 or 4-1. so it is possible to run a 5" jet from a pump that can deliver 120gpm at 30psi which would result in 360gpm suction draw in the hose and a total volume to the dredge of the same 500gpm range. Only updates to your system would be flare, jet, and hose.
The main point is that a more efficient jet can reduce the total volume to the box and pump requirements so you don't want to buy or build the system based on the standard sizes used for most equipment using a standard log jet if you are going to build a jet and want to save some bucks.
If the state allows the use of a six inch, and its in your budget, on good ground you will beat that six grams a day easy.