I'm building a hand dredge and have a question.
Hey everyone.
Decided to build a hand dredge this weekend. I still need to get a few parts but this is what I have so far.
It has 2 check valves and when finished will have a hose feeding to a 5 gal bucket from the 45 degree outlet. The nozzles are threaded so i can switch between 3/4 and 1/2 in depending on the need.
Since this is my first dredge I'm not sure how long to leave the nozzles? Also, how much hose can I get away with going to the bucket? I was looking at connecting 1-1/2 in but I can use 1-1/4 as well.
Any feedback is appreciated.
Hey everyone.
Decided to build a hand dredge this weekend. I still need to get a few parts but this is what I have so far.
It has 2 check valves and when finished will have a hose feeding to a 5 gal bucket from the 45 degree outlet. The nozzles are threaded so i can switch between 3/4 and 1/2 in depending on the need.
Since this is my first dredge I'm not sure how long to leave the nozzles? Also, how much hose can I get away with going to the bucket? I was looking at connecting 1-1/2 in but I can use 1-1/4 as well.
Any feedback is appreciated.