THE Random Chat Thread - AKA "The RCT" - No shirt or shoes required - Open 24 / 7

Screenshot_20241214_063953_Weather Network.jpg
 

Cannot rebuild or fix anything UNTIL you have a permit....
These have a minimum 2 month waiting line... and thats the absolute best case scenario.
I'm no authority but hear and see a glimpse now and then at mold.
Structure exposed to the elements and even if it has enough integrity to repair , mold can ruin that idea unless stripping it down and remediating.

Real estate pics (past pre recent storms) showing a ceiling fan with sagging blades halfway down thier spans...It's been slightly humid.

The delays in trying to resolve a claim and then locate a contractor combined? Well odds are the average is going to increase delay.
 

Now I think the big buck has returned with his herd.
(Then again maybe just big hoofed)

20241214_120359.jpg
20241214_120405.jpg


Lots of disturbed areas from eating the acorns laying about.

20241214_120547.jpg


Maybe it's time to set up a few cameras again.
Got tired of looking at thousands of pictures of a raccoon. 🤣
 

Top Member Reactions

Users who are viewing this thread

  • Back
    Top