Indiana_Jonz
Jr. Member
FOLKS
I'm a mechanical Engineer and I have developed a dry "scrub" system that requires no water for separating gold and black sands from gravel eliminating water induction for "srubbing" the feed gravels. I need to build the system on a larger scale to prove the system on a 200 tons/hour of gravel feed from feed hopper to processor. What I need: the means to build the system and a gold producing mine that is dry and arid for proving the system. Non disclosure agreement required before prototype build.
Thanks
I'm a mechanical Engineer and I have developed a dry "scrub" system that requires no water for separating gold and black sands from gravel eliminating water induction for "srubbing" the feed gravels. I need to build the system on a larger scale to prove the system on a 200 tons/hour of gravel feed from feed hopper to processor. What I need: the means to build the system and a gold producing mine that is dry and arid for proving the system. Non disclosure agreement required before prototype build.
Thanks