Crookedrecords
Jr. Member
- Mar 2, 2009
- 21
- 1
I've got all of the parts and material to put together a micro-cleanup sluice. I have some regular ribbed rubber matting and some "deep v" rubber matting which just has bigger and deeper grooves.
What I am trying to figure out is, would it be better to have the small riffles first and then the large in the sluice or the large riffles first and then the small or should I just make two sluice boxes one with small, one with large?
I will be classifying all of the material and running each separately (8,20,50,100)
Thanks..
What I am trying to figure out is, would it be better to have the small riffles first and then the large in the sluice or the large riffles first and then the small or should I just make two sluice boxes one with small, one with large?
I will be classifying all of the material and running each separately (8,20,50,100)
Thanks..