HurtHawk hits a pocket

thanks for posting Hurthawk
 

>:( Ifn' the waterboard has their way( Sac meeting Nov 1st) come January that'll be a $10,000 fine MINIMUM and jail time too-stinkn' bureauratz---John
 

Hoser John said:
>:( Ifn' the waterboard has their way( Sac meeting Nov 1st) come January that'll be a $10,000 fine MINIMUM and jail time too-stinkn' bureauratz---John
Yep,I am Taking the CESSWI test tomorrow......this regulation is B.S.,and no joke!!!
 

Hoser John said:
CESSWI test??? All right ya got me on than'n Kuger??? ??? John
Certified Erosion,Sediment,and Storm Water Inspector(Federal Part of the Calif CEQWA)I have to do it for my job....anybody doing anything on over an acre of ground will have to abide by these Laws that took effect Sept 1.Storm Water is basically classified as a means of a Pollutant.If what I am reading of this ever applies to even sluicing I dont see a leg to stand on
 

Hoser John said:
>:( Ifn' the waterboard has their way( Sac meeting Nov 1st) come January that'll be a $10,000 fine MINIMUM and jail time too-stinkn' bureauratz---John

When and where John? Is it an open meeting?
Thanks

Hefty
 

kuger said:
Hoser John said:
CESSWI test??? All right ya got me on than'n Kuger??? ??? John
Certified Erosion,Sediment,and Storm Water Inspector(Federal Part of the Calif CEQWA)I have to do it for my job....anybody doing anything on over an acre of ground will have to abide by these Laws that took effect Sept 1.Storm Water is basically classified as a means of a Pollutant.If what I am reading of this ever applies to even sluicing I dont see a leg to stand on

Is that an acre at one time? Cause i dont cover an acre when highbaking?
 

Hefty1 said:
kuger said:
Hoser John said:
CESSWI test??? All right ya got me on than'n Kuger??? ??? John
Certified Erosion,Sediment,and Storm Water Inspector(Federal Part of the Calif CEQWA)I have to do it for my job....anybody doing anything on over an acre of ground will have to abide by these Laws that took effect Sept 1.Storm Water is basically classified as a means of a Pollutant.If what I am reading of this ever applies to even sluicing I dont see a leg to stand on

Is that an acre at one time? Cause i dont cover an acre when highbaking?
Yes,that is an acre Heft,but that is the construction end of it....they are already talking about it with Dredging and if they go by the same rules for that you will have to file a NOI,have a certified Engineer write a SWEPP Plan,which will have to be followed,updated weekly into the SMART system online,possible water samples taken above and below work area,and then a BMP use,before during and after work is concluded(BMP=Better Management Practices=erosion control,sediment travel,levels of turbitity to not exceed a certain threshhold at any time etc,etc.)It is rediculous and the fines can be $10,000 per gallon of "polluted",water,in a run off.....and then you have the FED fines
 