1637
Bronze Member
dont make fun of my blue print.trying to get dirt farther from hole and not have to shovel so high.or get in and out of hole,just thinking out loud,if i put 2 or 3 shovel loads in the 8 or 10 inch pvc and lift in it.any better ideas just no dam buckets,been there.i think i can make it for about 150 dollars
thanks brad
thanks brad
Last edited: