~MetalDigger~
Full Member
How about technique, When you get to a special spot, one you have never actually set foot on . Whats the first thing you do. Scan the area and determine the size, length,depth,etc. Land Marks, Traces of water creeks, old wells, or foundations.
Do you then start griding of ares, first or hit the likely spots first. Are their any other things to look for, such as rock/soil compositions, old road beds.
And what kind of pattern do you grid with 12'X12''s, etc.
Say it's a one acre lot. How long would it take you to really cover such an area. Thanks for you input, and if I left any details out please explain.
And I do believe in having permission first.
Do you then start griding of ares, first or hit the likely spots first. Are their any other things to look for, such as rock/soil compositions, old road beds.
And what kind of pattern do you grid with 12'X12''s, etc.
Say it's a one acre lot. How long would it take you to really cover such an area. Thanks for you input, and if I left any details out please explain.
And I do believe in having permission first.